What it measures
SDR productivity measures how many qualified meetings a sales development team produces per full-time equivalent (FTE) over a period, and per FTE working day. An SDR (sales development representative) prospects and books first meetings for account executives. Sales leaders and founders use the measure to plan capacity, set meeting goals and spot changes over time. By default it counts meetings that were held and met your qualification criteria, not meetings that were merely scheduled.
Explain this formula
Divide the total number of qualified meetings by the number of active SDR FTE: that is the output per FTE for the period. FTE converts people into full-time capacity, so two half-time SDRs count as 1 FTE and someone active for half the month counts as 0.5.
Then divide the total by FTE × working days to get qualified meetings per FTE working day, which makes periods of different length comparable. If you enter a planned meeting goal, the calculator also shows attainment (meetings ÷ goal × 100) and the gap still missing (goal − meetings, never below zero). FTE and working days must be greater than zero.
What each term means
- Qualified meetings held
- Meetings actually held and meeting team quality criteria.
- Where to find it: Meetings sourced by the SDR team that were held in the period and accepted as qualified under your written criteria, usually from the CRM meeting or opportunity records. Exclude no-shows and meetings still upcoming.
- Active SDR FTE
- Full-time equivalent headcount active in period, e.g. two half-time reps = 1.
- Where to find it: Full-time equivalent SDR capacity actually active in the period. Prorate part-time contracts, mid-period arrivals and departures, and long absences. Fractions such as 2.5 are allowed.
- Working days
- Working days included in the measured period.
- Where to find it: Working days in the measured period after public holidays and company closures. Use the same calendar for every period you compare.
- Planned meeting goal (optional)
- Qualified meetings the team planned for the same period, to compare output with plan.
- Where to find it: Optional: the qualified meetings the team planned for the same period and the same FTE. Leave it empty if there was no goal; attainment is then not shown.
- Qualified meetings per FTE
- Qualified meetings held ÷ active SDR FTE, for the measured period.
- Meetings per FTE working day
- Qualified meetings ÷ (FTE × working days).
Worked example
Hypothetical example: over a month with 20 working days, a team of 3 full-time SDRs produced 60 qualified meetings.
- Qualified meetings per FTE60 ÷ 3 = 20
- Meetings per FTE working day60 ÷ (3 × 20 days) = 1
Qualified meetings per FTE = 20
60 ÷ 3 = 20 qualified meetings per FTE for the month, and 60 ÷ (3 × 20) = 1 meeting per FTE working day. If one of the three SDRs had joined mid-month, active capacity would be 2.5 FTE: the same 60 meetings would then mean 24 per FTE and 1.2 per FTE working day. With a planned goal of 72, attainment would be about 83.3 % with 12 meetings missing.
Hypothetical numbers, used to show the calculation. Not real company data.
When and why to use it
Use it to plan capacity. If the team needs 90 qualified meetings next month and produces about 20 per FTE, the plan implies roughly 4.5 FTE of productive capacity, or a change in how meetings are generated.
Use it to follow one team over time with stable definitions: the same qualification criteria, FTE computed the same way, the same working-day calendar. A drop in meetings per FTE working day is a signal worth investigating; the cause still has to be found.
Use the optional goal to compare output with plan for the same period and capacity. A gap is a planning question first: was the goal set for the capacity actually available?
Why SDR output is a capacity measure, not a universal effectiveness ranking
Meetings per FTE describe what the team produced with the capacity it had. They do not, on their own, say who is better at the job. A newly hired SDR in ramp-up, a rep covering a territory with few suitable accounts, or one who receives fewer inbound leads to follow up will produce fewer meetings for reasons that have little to do with skill.
Calendars matter as well. A month with holidays, training days or a product launch that absorbs time leaves fewer working days, which is why the per-working-day figure exists. Before comparing two people or two months, check that ramp status, territory, lead flow and available days are similar, or compare each person with their own previous periods instead.
Raw activity is not a quality proxy. Counting calls or emails rewards volume, and counting scheduled meetings rewards bookings that may never happen. Counting held, qualified meetings is closer to what the sales team needs, but quality still shows later: in the share of those meetings that become opportunities and, eventually, won deals.
How to read and improve the result
A higher number of qualified meetings per FTE means more output for the same capacity. It rises with more meetings or fewer FTE, and the per-day figure also rises when the same meetings come from fewer working days.
Read changes alongside their context: new hires ramping, changes in territory or lead flow, a stricter qualification standard. A fall caused by stricter qualification can be a healthy correction rather than a loss of productivity.
Practical levers
- Protect prospecting time from internal meetings and administrative tasks.
- Give SDRs well-targeted account lists so effort goes to prospects who can qualify.
- Shorten ramp-up with call reviews, message libraries and clear qualification criteria.
- Balance territories and lead routing so capacity is not idle in one place and saturated in another.
- Agree on qualification with account executives so qualified meetings are accepted consistently.
Common mistakes
- Counting scheduled meetings, including no-shows, instead of held qualified meetings.
- Dividing by headcount rather than FTE when people joined, left or worked part-time.
- Ranking individuals without accounting for ramp-up, territory and lead flow.
- Using calls or emails sent as a proxy for productive output.
- Comparing months with very different numbers of working days using the per-FTE total only.
Scenario comparison
The conservative and optimistic cases change qualified meetings by ±15 % and working days by ±2, while keeping FTE unchanged. The meetings change moves both results; the working-day change only moves the per-day figure, which shows how much the calendar alone affects it.
Use the cases to test planning assumptions, for example a month with two more holidays, rather than as targets for individual SDRs.
Methodology and limitations
The result depends on the qualification standard. If criteria change during the year, meetings per FTE before and after the change are not directly comparable.
FTE is an approximation of capacity. It does not capture time spent on tasks other than prospecting, or the ramp-up of people who are formally full-time but still learning.
Output says nothing about downstream value. Pair it with the meeting-to-opportunity rate and the win rate of SDR-sourced opportunities before drawing conclusions about effectiveness.
Frequently asked questions
How is SDR productivity calculated?
Qualified meetings per FTE = total qualified meetings ÷ active SDR FTE; per FTE working day = total ÷ (FTE × working days). With 60 meetings, 3 FTE and 20 working days, that is 20 per FTE for the period and 1 per FTE working day.
Should I count scheduled or held meetings?
Held and qualified meetings by default. Scheduled meetings include no-shows and bookings that do not meet your criteria, which inflates output without adding sales capacity.
How do I count part-time or new SDRs?
Convert them to FTE. A half-time SDR is 0.5 FTE; someone who joined halfway through the period is about 0.5 FTE for that period. You may also want to analyse ramping SDRs separately.
Can I use this to rank my SDRs?
Only with care. Differences in ramp-up, territory, lead flow and absences change output for reasons unrelated to performance. Comparing each person with their own past periods is usually more informative.
Why show meetings per working day?
Because periods differ in length and holidays. The per-day figure lets you compare a 17-day month with a 22-day month on the same basis.
What does the meeting gap show?
The number of qualified meetings still missing to reach the planned goal for the same period. It is never negative: if the goal was exceeded, the gap is zero and attainment is above 100 %.
Sources
Last reviewed:
Related calculators
- Sales Prospecting Activity CalculatorWork back from the number of deals you want to win to the number of prospects you need to contact, and see how each conversion step multiplies the effort.
- Meeting Booking Rate CalculatorFind out what share of the people you contacted actually booked a meeting, and how many prospects you need to reach for each booking.
- Meeting Show-Up Rate CalculatorMeasure how many of your scheduled sales meetings actually happened, and how many were lost to no-shows, with rules you can apply the same way every month.
- Outbound Sales ROI CalculatorModel whether your outbound prospecting pays for itself, using the contribution it generates rather than the revenue it closes, and see the revenue level at which it breaks even.